Key Insights
The Thailand data center construction market exhibits robust growth potential, driven by the nation's burgeoning digital economy, increasing cloud adoption, and the government's initiatives to enhance digital infrastructure. A Compound Annual Growth Rate (CAGR) of 12.53% from 2019 to 2024 suggests a significant expansion, with the market expected to maintain this trajectory through 2033. Key drivers include the rising demand for data storage and processing from sectors such as IT & Telecommunications, BFSI (Banking, Financial Services, and Insurance), and the government itself, necessitating substantial investment in data center infrastructure. The expanding use of 5G technology and the increasing prevalence of IoT devices are further fueling market expansion. Market segmentation reveals a strong focus on larger-scale data centers (Medium, Large, Massive, Mega), reflecting the need for robust capacity to support the growing data demands. Tier 1 and Tier data centers dominate the market, indicating a preference for high-reliability and redundancy. While the specific market size for 2025 is not provided, based on the 12.53% CAGR and assuming a reasonable base year value, extrapolating from the growth indicates a substantial increase from 2024 values. Leading companies such as Equinix Inc., NTT Communications Corporation, and local players like DCI Indonesia are actively contributing to this growth, fostering healthy competition and technological innovation within the sector.
The presence of established global players alongside domestic companies suggests a mature yet rapidly developing market. The growth is likely to be further propelled by Thailand’s strategic geographical location as a regional hub and government incentives encouraging foreign investment in the technology sector. However, potential restraints include the need for skilled labor and the cost of land and energy, factors that will shape future investment decisions. Continuous technological advancements, including increased energy efficiency solutions and sustainable data center designs, will play a vital role in shaping the future landscape of Thailand's data center construction market, contributing to its sustained growth trajectory.

Thailand Data Center Construction Market: A Comprehensive Report (2019-2033)
This detailed report provides a comprehensive analysis of the Thailand data center construction market, offering invaluable insights for investors, industry professionals, and strategic decision-makers. Covering the period from 2019 to 2033, with a base year of 2025 and a forecast period of 2025-2033, this report offers a granular view of market trends, key players, and future growth potential. The study encompasses various segments including end-user industries, infrastructure types, data center size, and tier levels.
Thailand Data Center Construction Market Structure & Competitive Dynamics
This section analyzes the competitive landscape of the Thailand data center construction market. The market is characterized by a mix of both established international players and local companies, leading to a moderately consolidated market structure. While exact market share figures for each player are proprietary data, companies like Equinix Inc, NTT Communications Corporation, and Space DC Pte Ltd hold significant market positions. The level of innovation is relatively high, driven by advancements in technology and increasing demand. The regulatory framework is undergoing constant evolution to support the growth of the data center sector in Thailand, promoting foreign investment. Mergers and acquisitions (M&A) activity is prevalent, with deal values fluctuating based on market conditions. For instance, recent M&A activity in the region involving players like XL Axiata Tbk PT (Princeton Digital Group) has impacted the market structure. We estimate that M&A deal values totalled approximately xx Million in 2024. The current market is witnessing intense competition, fuelled by technological advancements and increasing customer demand. End-user trends show a steady shift towards cloud-based services and increased data storage needs, which in turn fuels the data center construction market.
Thailand Data Center Construction Market Industry Trends & Insights
The Thailand data center construction market is experiencing robust growth, driven by factors such as increasing digitalization, government initiatives to promote digital infrastructure, and the burgeoning adoption of cloud computing services. The market's Compound Annual Growth Rate (CAGR) during the historical period (2019-2024) is estimated at xx%, projected to reach xx% during the forecast period (2025-2033). Market penetration of cloud services is a significant driver, with a projected increase from xx% in 2024 to xx% by 2033. Technological disruptions, such as the adoption of hyperscale data center designs and AI-powered infrastructure management, are further shaping the market landscape. Competitive dynamics are defined by aggressive expansion strategies, technological advancements, and price competition. Consumer preferences are shifting towards energy-efficient and sustainable data centers, creating new opportunities for providers who can meet these demands. Challenges remain, however, including the availability of skilled labor and land acquisition costs.

Dominant Markets & Segments in Thailand Data Center Construction Market
The IT & Telecommunication segment dominates the end-user landscape, accounting for approximately xx Million of the total market value in 2024, followed by the BFSI (Banking, Financial Services, and Insurance) sector. This dominance is primarily due to the high demand for robust IT infrastructure and data security in these sectors.
- Key Drivers for IT & Telecommunication Dominance: Rapid expansion of digital services, increasing data traffic, and the rise of cloud computing.
- Key Drivers for BFSI Dominance: Stringent regulatory compliance requirements and the need for secure data storage and processing.
In terms of infrastructure, the Electrical Infrastructure segment leads, with a market share of xx% in 2024, followed by Mechanical Infrastructure. This is driven by the critical role of power and cooling systems in data center operations. The Large and Mega data center size categories show the most significant growth potential, driven by the requirements of hyperscale cloud providers. Tier III and Tier IV data centers dominate the market due to their enhanced reliability and redundancy features. Bangkok is the leading region for data center construction, due to its established IT infrastructure and access to skilled labor.
Thailand Data Center Construction Market Product Innovations
Recent product innovations in the Thailand data center construction market focus on modular designs, prefabricated components, and sustainable technologies aimed at reducing construction time and operational costs. The adoption of advanced cooling systems, including liquid cooling and AI-powered management systems, are improving energy efficiency and reducing environmental impact. These innovations are creating competitive advantages for companies offering more cost-effective and sustainable solutions to meet the evolving needs of clients.
Report Segmentation & Scope
This report segments the Thailand data center construction market in detail across various parameters:
By End User: IT & Telecommunication, BFSI, Government, Healthcare, Other End User. Each segment's growth projections and market sizes are detailed in the full report, along with competitive dynamics.
By Infrastructure: Electrical Infrastructure (Power systems, UPS systems), Other Electrical Infrastructure (Lighting and cabling), Mechanical Infrastructure (Cooling systems, HVAC), Other Mechanical Infrastructure (Fire suppression, security), Other Infrastructure (Racking, cabling). Each segment's growth is projected and market sizes are provided in the report.
By DC Size: Small, Medium, Large, Massive, Mega. Market share projections and growth analysis are included for each data center size category.
By Tier Type: Tier I, Tier II, Tier III, Tier IV. This report offers a detailed analysis of the market size and growth projections for each tier type.
Key Drivers of Thailand Data Center Construction Market Growth
The growth of the Thailand data center construction market is driven by several key factors: Firstly, the increasing adoption of cloud computing and digital services is fueling the demand for data center infrastructure. Secondly, government initiatives aimed at promoting digitalization and investment in ICT infrastructure provide further impetus. Thirdly, the growing presence of multinational companies and the expansion of e-commerce are contributing to the market's expansion. Lastly, improvements in transportation and connectivity boost the attractiveness of Thailand's location.
Challenges in the Thailand Data Center Construction Market Sector
The market faces several challenges including a shortage of skilled labor leading to cost increases and project delays (estimated impact xx Million annually). Land acquisition costs in prime locations are also significantly impacting project economics. Furthermore, regulatory complexities and uncertainties add to project costs and timelines. Competition from established international players poses a challenge for local companies, and fluctuations in energy costs impact operational expenses.
Leading Players in the Thailand Data Center Construction Market Market
- Space DC Pte Ltd
- DTPNet
- Project Planning Service
- NTT Communications Corporation
- XL Axiata Tbk PT (Princeton Digital Group)
- Equinix Inc
- Telkomsigma
- GTN Data Center
- TAKNET Systems (Thailand ) Co Ltd
- Arup Group
- Lintasarta
- PT DCI Indonesia (DCI)
- Biznet Networks
- JupiterDC
- PT Faasri Utama Sakti
- Gulf Energy Development Public Company Limited
- Delta Electronics (Thailand)
- Indosat Tbk PT
Key Developments in Thailand Data Center Construction Market Sector
- February 2023: Singapore Telecom Limited (Singtel), Gulf Energy Development PLC (Gulf), and Advanced Info Services PLC (AIS) announced a joint venture to build a 20 MW capacity data center in Thailand by 2025. This development signifies a significant investment in the country's data center infrastructure and highlights the growing interest from major international players. The facility will be operated by GSA Data Center Company Limited (GSA).
Strategic Thailand Data Center Construction Market Outlook
The Thailand data center construction market exhibits strong growth potential, driven by ongoing digital transformation and increasing demand for cloud services. Strategic opportunities exist for companies offering innovative, sustainable, and cost-effective solutions. The focus on energy efficiency and renewable energy sources will be crucial for future success. Government support for the sector and the country's strategic location will continue to attract further investments in the years to come, leading to sustained market growth.
Thailand Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Distribution Solutions
-
2.2. Power Backup Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Distribution Solutions
-
4. Power Backup Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier 2 and 2
- 11.2. Tier 3
- 11.3. Tier 4
- 12. Tier 2 and 2
- 13. Tier 3
- 14. Tier 4
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
Thailand Data Center Construction Market Segmentation By Geography
- 1. Thailand

Thailand Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 12.53% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 9.1 Migration to Cloud by large businesses9.2 Established 'Mobile-First' Landscape Since the Recent Past
- 3.3. Market Restrains
- 3.3.1. 10.1 Shortage of Skilled Professionals Presenting a Challenge for Several Contractors
- 3.4. Market Trends
- 3.4.1. Tier 3 is the Largest Tier Type
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Thailand Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Distribution Solutions
- 5.2.2. Power Backup Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Distribution Solutions
- 5.4. Market Analysis, Insights and Forecast - by Power Backup Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier 2 and 2
- 5.11.2. Tier 3
- 5.11.3. Tier 4
- 5.12. Market Analysis, Insights and Forecast - by Tier 2 and 2
- 5.13. Market Analysis, Insights and Forecast - by Tier 3
- 5.14. Market Analysis, Insights and Forecast - by Tier 4
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Region
- 5.21.1. Thailand
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 Space DC Pte Ltd
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 DTPNet
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 Project Planning Service
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 NTT Communications Corporation
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 XL Axiata Tbk PT (Princeton Digital Group)
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Equinix Inc
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Telkomsigma
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 GTN Data Center
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 TAKNET Systems (Thailand ) Co Ltd
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Arup Group
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Lintasarta
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 PT DCI Indonesia (DCI)
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 Biznet Networks
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 JupiterDC
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 PT Faasri Utama Sakti
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.16 Gulf Energy Development Public Company Limited
- 6.2.16.1. Overview
- 6.2.16.2. Products
- 6.2.16.3. SWOT Analysis
- 6.2.16.4. Recent Developments
- 6.2.16.5. Financials (Based on Availability)
- 6.2.17 Delta Electronics (Thailand)
- 6.2.17.1. Overview
- 6.2.17.2. Products
- 6.2.17.3. SWOT Analysis
- 6.2.17.4. Recent Developments
- 6.2.17.5. Financials (Based on Availability)
- 6.2.18 Indosat Tbk PT
- 6.2.18.1. Overview
- 6.2.18.2. Products
- 6.2.18.3. SWOT Analysis
- 6.2.18.4. Recent Developments
- 6.2.18.5. Financials (Based on Availability)
- 6.2.1 Space DC Pte Ltd
List of Figures
- Figure 1: Thailand Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Thailand Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Thailand Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Thailand Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: Thailand Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 4: Thailand Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 5: Thailand Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 6: Thailand Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 7: Thailand Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 8: Thailand Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 9: Thailand Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 10: Thailand Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 11: Thailand Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 12: Thailand Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 13: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 2 and 2 2019 & 2032
- Table 14: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 15: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 16: Thailand Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 17: Thailand Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 18: Thailand Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 19: Thailand Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 20: Thailand Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 21: Thailand Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 22: Thailand Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 23: Thailand Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 24: Thailand Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 25: Thailand Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 26: Thailand Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 27: Thailand Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 28: Thailand Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 29: Thailand Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 30: Thailand Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 31: Thailand Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 32: Thailand Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 33: Thailand Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 34: Thailand Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 35: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 2 and 2 2019 & 2032
- Table 36: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 37: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 38: Thailand Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 39: Thailand Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 40: Thailand Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 41: Thailand Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 42: Thailand Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 43: Thailand Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 44: Thailand Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Thailand Data Center Construction Market?
The projected CAGR is approximately 12.53%.
2. Which companies are prominent players in the Thailand Data Center Construction Market?
Key companies in the market include Space DC Pte Ltd, DTPNet, Project Planning Service, NTT Communications Corporation, XL Axiata Tbk PT (Princeton Digital Group), Equinix Inc, Telkomsigma, GTN Data Center, TAKNET Systems (Thailand ) Co Ltd, Arup Group, Lintasarta, PT DCI Indonesia (DCI), Biznet Networks, JupiterDC, PT Faasri Utama Sakti, Gulf Energy Development Public Company Limited, Delta Electronics (Thailand), Indosat Tbk PT.
3. What are the main segments of the Thailand Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Backup Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier 2 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
9.1 Migration to Cloud by large businesses9.2 Established 'Mobile-First' Landscape Since the Recent Past.
6. What are the notable trends driving market growth?
Tier 3 is the Largest Tier Type.
7. Are there any restraints impacting market growth?
10.1 Shortage of Skilled Professionals Presenting a Challenge for Several Contractors.
8. Can you provide examples of recent developments in the market?
February 2023:Singapore Telecom Limited (Singtel), Gulf Energy Development PLC (Gulf), and Advanced Info Services PLC (AIS), established a joint venture to build a 20 MW capacity data center in Thailand by 2025. This facility will be operated by GSA Data Center Company Limited (GSA). The company aims to match the large-scale data center requirements of cloud players in the country.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Thailand Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Thailand Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Thailand Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Thailand Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence