Key Insights
The Sweden data center construction market, valued at approximately €150 million in 2025, is poised for robust growth, exhibiting a Compound Annual Growth Rate (CAGR) of 5.89% from 2025 to 2033. This expansion is fueled by several key drivers. The increasing adoption of cloud computing and big data analytics necessitates robust data center infrastructure, creating significant demand for new construction and expansion projects. Furthermore, stringent data privacy regulations within the EU and Sweden specifically are driving organizations to build local data centers, reducing reliance on international infrastructure and improving data sovereignty. The burgeoning IT and telecommunications sector in Sweden, coupled with the expansion of digital services in sectors such as BFSI (Banking, Financial Services, and Insurance) and healthcare, further contributes to market growth. While challenges such as high construction costs and skilled labor shortages exist, the long-term outlook remains positive, particularly for Tier 1 and large-scale data center projects catering to major corporations and cloud providers.
The market segmentation reveals a significant focus on infrastructure components such as cooling and power infrastructure, racks and cabinets, and servers. Significant investments are being made in enhancing physical security features within data centers to protect sensitive information. The substantial involvement of large construction companies like Per Aarsleff A/S, Caverion Corporation, and others underscores the significant capital investment and complexity involved in these projects. Future growth will likely see increased focus on sustainable data center designs and operations, incorporating green technologies and energy-efficient solutions to meet environmental regulations and reduce operational costs. The government's commitment to digital infrastructure development will also continue to play a vital role in shaping market growth and investment opportunities in the coming years.

Sweden Data Center Construction Market: A Comprehensive Report (2019-2033)
This in-depth report provides a comprehensive analysis of the Sweden data center construction market, offering valuable insights into market dynamics, growth drivers, and future opportunities. The study period covers 2019-2033, with 2025 as the base and estimated year. The forecast period spans 2025-2033, while the historical period encompasses 2019-2024. This report is indispensable for investors, industry professionals, and strategic decision-makers seeking to navigate this rapidly evolving market.
Sweden Data Center Construction Market Market Structure & Competitive Dynamics
The Sweden data center construction market exhibits a moderately concentrated structure, with a mix of multinational corporations and local players. Market share data indicates that a few major players, such as Johnson Controls International PLC, Schneider Electric SE, and IBM Corporation, hold significant portions of the market, while numerous smaller companies cater to niche segments. The innovation ecosystem is vibrant, driven by advancements in cooling technologies, power infrastructure, and security systems. The regulatory framework is largely supportive of data center development, focusing on sustainability and security. Product substitutes are limited, as data centers require specialized infrastructure. End-user trends indicate a growing demand from the IT & Telecommunication and BFSI sectors. M&A activity has been moderate, with deal values ranging from xx Million to xx Million USD in recent years. Specific examples include [Insert specific M&A examples if available, including deal values and involved companies].
- Market Concentration: Moderately concentrated, with a few dominant players.
- Innovation: Driven by advancements in cooling, power, and security technologies.
- Regulatory Framework: Supportive, with emphasis on sustainability and security.
- M&A Activity: Moderate activity, with deal values ranging from xx Million to xx Million USD.
Sweden Data Center Construction Market Industry Trends & Insights
The Sweden data center construction market is experiencing robust growth, driven by increasing data consumption, the proliferation of cloud computing, and government initiatives promoting digitalization. The Compound Annual Growth Rate (CAGR) for the forecast period (2025-2033) is projected at xx%, reflecting the strong market expansion. Technological disruptions, such as the adoption of AI and edge computing, further fuel this growth. Consumer preferences are shifting towards sustainable and energy-efficient data center solutions, influencing design and construction practices. Competitive dynamics are characterized by intense rivalry among major players, emphasizing innovation and cost-effectiveness. Market penetration of advanced technologies like liquid cooling and AI-powered power management systems is increasing steadily, though still at a relatively early stage in wider adoption. The rising adoption of hyperscale data centers, especially in Stockholm and other major metropolitan areas, significantly contributes to overall market growth.

Dominant Markets & Segments in Sweden Data Center Construction Market
The Stockholm region dominates the Sweden data center construction market due to its robust infrastructure, skilled workforce, and proximity to major IT hubs. Within the Infrastructure segment, Cooling Infrastructure and Power Infrastructure represent the largest shares, driven by the need for high reliability and energy efficiency. The IT & Telecommunication sector is the leading end-user segment, owing to the high data storage and processing demands of this industry.
Key Drivers for Stockholm Dominance:
- Robust infrastructure
- Skilled workforce
- Proximity to major IT hubs
- Favorable government policies
Dominant Infrastructure Segments: Cooling Infrastructure and Power Infrastructure. Reasons for dominance include the critical role these play in ensuring data center uptime and performance. Investment in renewable energy sources further fuels growth in this area.
Dominant End-User Segment: IT & Telecommunication. The rapid growth of data traffic and the increasing adoption of cloud services make this sector a primary driver of data center construction.
Data Center Size: Large and Mega data centers are gaining traction, driven by hyperscale deployments.
Sweden Data Center Construction Market Product Innovations
Recent innovations focus on sustainable and energy-efficient solutions, including liquid cooling systems, AI-powered power management, and modular data center designs. These innovations improve operational efficiency and reduce environmental impact. The increasing adoption of prefabricated modular data centers is accelerating construction timelines and reducing costs. The market is witnessing increased focus on enhanced security measures, including biometric access control and advanced surveillance systems. These product innovations cater to growing demands for higher capacity, enhanced resilience, and lower operating costs.
Report Segmentation & Scope
This report segments the Sweden data center construction market across several key parameters:
Infrastructure: Cooling Infrastructure, Power Infrastructure, Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, Other Infrastructure. Growth projections vary significantly across these segments, with cooling and power showing the fastest growth.
End User: IT & Telecommunication, BFSI, Government, Healthcare, Other End User Tier. IT & Telecommunications is expected to remain the dominant segment.
Data Center Type: Tier 1, Tier 2, Tier 3. Demand for Tier 3 facilities is expected to grow rapidly.
Data Center Size: Small, Medium, Large, Mega, Massive. Mega and Massive data centers are experiencing significant growth.
Each segment's growth projection, market size, and competitive landscape are analyzed in detail within the full report.
Key Drivers of Sweden Data Center Construction Market Growth
The growth of the Sweden data center construction market is propelled by several key factors:
- The expanding digital economy and increasing data consumption.
- The rising adoption of cloud computing and edge computing technologies.
- Government initiatives promoting digitalization and the development of data centers.
- Investments in renewable energy sources to support data center operations.
Challenges in the Sweden Data Center Construction Market Sector
Several challenges hinder the growth of the Sweden data center construction market:
- Land scarcity and high land prices in prime locations create obstacles for large-scale data center projects.
- High energy costs affect the overall cost of data center operations.
- Competition for skilled labor can lead to project delays and cost overruns. The current labor market shortages negatively impact the speed of construction and successful project completion.
Leading Players in the Sweden Data Center Construction Market Market
- Per Aarsleff A/S
- Johnson Controls International PLC
- Caverion Corporation
- Dornan (Engineering Works)
- IBM Corporation
- Legrand SA
- NetApp Inc
- ALFA LAVAL AB
- Schneider Electric SE
- Arista Networks
- DPR CONSTRUCTION INC
- Arup Group Limited
- Kirby Group Engineering
- AECOM
- Coromatic AB Sweden
Key Developments in Sweden Data Center Construction Market Sector
October 2022: Conapto and Fastpartner signed an agreement to construct a 10,000-square-meter data center in southern Stockholm, with a capacity for an 8000 square meter data center and 20 MW of power. This signifies significant investment and expansion in the market.
February 2022: EcoDataCenter invested approximately 4.79 USD Million in a collaborative project with Ellevio and Falu Energi & Vatten to secure 80 MW of renewable electricity for its data center, demonstrating a commitment to sustainable practices within the industry.
Strategic Sweden Data Center Construction Market Outlook
The Sweden data center construction market exhibits significant growth potential. Continued investment in digital infrastructure, the ongoing shift towards cloud computing, and increasing focus on sustainable solutions will fuel market expansion. Strategic opportunities lie in developing energy-efficient data center designs, leveraging prefabricated modular construction, and providing comprehensive design and consulting services. Focusing on renewable energy integration and improving data center security features will also unlock significant growth potential for companies in this sector.
Sweden Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. By Electrical Infrastructure
-
1.1.1. Power Distribution Solutions
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Back-up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solutions
-
1.2. By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. By Electrical Infrastructure
-
2. Tier Type
- 2.1. Tier I and II
- 2.2. Tier III
- 2.3. Tier IV
-
3. End User
- 3.1. Banking, Financial Services, and Insurance
- 3.2. IT and Telecommunications
- 3.3. Government and Defense
- 3.4. Healthcare
- 3.5. Other End Users
Sweden Data Center Construction Market Segmentation By Geography
- 1. Sweden

Sweden Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 5.89% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
- 3.3. Market Restrains
- 3.3.1. Security Challenges Impacting Growth of Data Centers
- 3.4. Market Trends
- 3.4.1. IT and Telecom to have significant market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Sweden Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solutions
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Back-up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solutions
- 5.1.2. By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Tier Type
- 5.2.1. Tier I and II
- 5.2.2. Tier III
- 5.2.3. Tier IV
- 5.3. Market Analysis, Insights and Forecast - by End User
- 5.3.1. Banking, Financial Services, and Insurance
- 5.3.2. IT and Telecommunications
- 5.3.3. Government and Defense
- 5.3.4. Healthcare
- 5.3.5. Other End Users
- 5.4. Market Analysis, Insights and Forecast - by Region
- 5.4.1. Sweden
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 Per Aarsleff A/S
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Johnson Controls International PLC
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 Caverion Corporation
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 Dornan(Engineering Works)
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 IBM Corporation
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Legrand SA
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 NetApp Inc
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 ALFA LAVAL AB
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 Schneider Electric SE
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Arista Networks
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 DPR CONSTRUCTION INC
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 Arup Group Limited
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 Kirby Group Engineering
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 AECOM
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 Coromatic AB Sweden
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.1 Per Aarsleff A/S
List of Figures
- Figure 1: Sweden Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Sweden Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Sweden Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Sweden Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: Sweden Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: Sweden Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: Sweden Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 6: Sweden Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 7: Sweden Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 8: Sweden Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 9: Sweden Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 10: Sweden Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 11: Sweden Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 12: Sweden Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 13: Sweden Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 14: Sweden Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 15: Sweden Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 16: Sweden Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 17: Sweden Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 18: Sweden Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 19: Sweden Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 20: Sweden Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Sweden Data Center Construction Market ?
The projected CAGR is approximately 5.89%.
2. Which companies are prominent players in the Sweden Data Center Construction Market ?
Key companies in the market include Per Aarsleff A/S, Johnson Controls International PLC, Caverion Corporation, Dornan(Engineering Works), IBM Corporation, Legrand SA, NetApp Inc , ALFA LAVAL AB, Schneider Electric SE, Arista Networks, DPR CONSTRUCTION INC, Arup Group Limited, Kirby Group Engineering, AECOM, Coromatic AB Sweden.
3. What are the main segments of the Sweden Data Center Construction Market ?
The market segments include Infrastructure, Tier Type, End User.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades.
6. What are the notable trends driving market growth?
IT and Telecom to have significant market share.
7. Are there any restraints impacting market growth?
Security Challenges Impacting Growth of Data Centers.
8. Can you provide examples of recent developments in the market?
October 2022: Conapto and the real estate firm Fastpartner signed an agreement to construct a 10,000-square-meter data center building in southern Stockholm. This land can accommodate an 8000 square meter data center and 20 MW of power when fully built.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Sweden Data Center Construction Market ," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Sweden Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Sweden Data Center Construction Market ?
To stay informed about further developments, trends, and reports in the Sweden Data Center Construction Market , consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence